Founder Logs #40 · Part of Binary and Beyond. LinkedIn newsletter edition follows.
Requirements are conversations that a document is allowed to end. I have watched a room relax once the sentence is in the ticket, because a sentence looks like a decision. Dealers can order a kit when stock is available. The button will disable itself. Nobody in the workshop disagreed, and the room heard that silence as agreement.
The sentence is doing a specific job. It claims the hearing is shared. When that claim is true, the button is a small piece of work. When the claim is unearned, the button ships on time and the argument about the word available starts the morning a workshop was promised a date.
The button that was called a requirement
This scene is a composite, not a client story. The shape is familiar.
A regional agency is building a dealer portal for a parts brand. The requirement sits in the statement of work and again in the ticket, in almost the same words. Dealers can place a kit order only when stock is available. If stock is unavailable, disable the order button and show a message.
Three people can read that sentence and leave with three products.
Brand sales operations hears the warehouse file they drop at 2 a.m. Available means the available-to-promise quantity on that file. A kit with four units is available. An order a dealer has opened and not submitted does not reduce the number.
A dealer principal on a Tuesday call hears a promise. If the button is enabled, he can tell the workshop a ship date out loud, and he will. The button is the sentence he is about to repeat to a customer with a car on a lift.
Credit control was not in the workshop. For them, available includes whether this dealer's open account still has room, and whether another branch of the same dealer group already holds a draft against those kits. In the version of this I keep seeing, a group opens four drafts against the same twelve kits. All four buttons are enabled. Three workshops are given dates. One shipment exists.
The requirement also has a clock it never names. The dealer opens the form at 9:10, while the file still shows four. A second branch submits at 9:14 and takes them. He submits at 9:18. Nothing in the sentence says whether available is checked at page load or at submit, or what he is told when the answer changes underneath him.
And the message. Marketing pictured "out of stock, try later." Sales pictured "leave the order with us, we will allocate on Thursday." Those are different products. The requirement contains both and names neither. "Show a message" is the line where the conversation stopped.
The happy path is a disabled button. The production path is which hearing the button is allowed to repeat, at which moment, and who is on the phone when two hearings disagree (Enterprise Software Is Mostly Negotiation, Why Every Workflow Is Really a State Machine).
Why the document feels like the end
Writing the requirement down is how a project shows progress, and how a workshop shows it may end. A sentence in a tracker has an owner, a status, and a test. A conversation has none of those until someone loses an argument.
Workshops reward the absence of objection. If credit control is not in the room, their hearing cannot object. The notes will say agreed. Agreed means unopposed by the people who were invited. That is a fact about the invitation list. The project treats it as a fact about the product.
A requirement you can already see how to build feels finished for the same reason. Disable the button when the quantity is zero is a control many of us have written. The quantity's parents are not in that sentence. Looking at the control tells the truth about the control. The room hears a truth about the rule.
A sharper noun does not bring the missing speaker in. "Available-to-promise quantity from the nightly file" chooses one hearing and leaves credit outside it. Precision can be how the workshop ends faster.
"We will confirm the rule with credit during the build" meets the gap without a decision. A confirmation that cannot change the button, or keep it from shipping, is a meeting you can no longer use. A longer requirement does not name who was allowed to finish. A person in the room does.
When nobody can say what the dealer is allowed to promise a workshop, the honest output is sometimes a narrower button, or no button (Why We Sometimes Say No to Projects).
A requirement is a conversation that stopped
Before I trust a written requirement, I separate two things the document glues together.
The sentence is what got written. It can be short, clear, and attached to a test. That shape is often honestly implementable.
The speaker set is everyone who will act on a hearing of that sentence, including the person who was not invited because their hearing would have kept the workshop open. Sales operations and the 2 a.m. file. The dealer who will say a date out loud. Credit control. The other branch with a draft still open. The person who has to call the workshop and take the date back.
A finished requirement is one of two outcomes. The speaker set has agreed on one hearing. Or the sentence has been split until each hearing has its own words, and the system is allowed to say only those words.
"Available means the 2 a.m. file, checked again at submit. Credit is a separate gate and can disable the button on its own. Drafts at another branch do not reserve. The message says the file had no quantity. It does not say Thursday will save the order."
That conversation continued until someone lost. Sales does not get a promise-shaped button. Credit does not hide inside the word available. The dealer gets a refusal he can repeat without inventing a date. Closure that costs nobody anything is a speaker you left out.
The expensive case is the sentence that closed because the room felt aligned. That alignment is often a missing person, and the document looks complete because the invitation list was.
An estimate that prices the sentence and not the speaker set is pricing the minutes (Every Software Estimate Is a Risk Estimate). The word available does a cousin of the work the word simple does. It ends the meeting before the contested fact has a name (The Most Expensive Word in Software: Simple). The requirement records the ending. It does not record who was spared it.
Where the conversation stops
I keep meeting the stopped conversation in three places, and it leaves a different hole in each.
In the workshop, before the ticket exists. Credit is called a later phase, which is a speaker renamed so they do not talk this week. The test is written from the notes, and a test cannot fail a hearing that was never spoken.
In the change request, after the date is fixed. "Can the message also let them save the order for allocation?" The date makes a new hearing feel like wording. The release has no row for it, so the row lands on whoever is already in the file.
In UAT, once the button matches the sentence. The script passes: one dealer, one kit, a file that matches the script. The first real Tuesday has two branches and a date said out loud. The bug is filed against the button that did what the sentence said.
| The requirement says | The conversation still owes |
|---|---|
| Order only when stock is available | Whose number, from which file, as of which minute |
| Disable the button | Whether a dealer with the form already open may finish |
| Show a message | A refusal, a waitlist, or a promise that Thursday will allocate |
| Stock | On-hand, available-to-promise, unreserved, or credit-cleared |
| The dealer | Which other branch already holds a draft against the same kits |
| If unavailable | Who calls the workshop and voids the date that was said out loud |
The right-hand column is the requirement. When those cells are blank, the blank is an assignment. It lands on the person who answers the phone when the button and the workshop disagree.
How a stopped conversation arrives as a bug
The first week can look finished. The button disables in the script. The trouble stays quiet until someone acts on a hearing the sentence allowed.
- Four drafts, one shipment. Three workshops were given dates. Credit control files a defect against the button. The button followed the 2 a.m. file, the only hearing the ticket named. Credit meets the sentence for the first time as an incident.
- A dealer opens the form while the file shows four. Another branch submits. He submits into a quantity the warehouse no longer has. The bug says the check did not work. The check worked at page load, which is the moment the requirement specified by never naming a moment.
- Sales asks the message to capture the order anyway, because they will allocate later. The ticket is a copy change. The button that was a refusal becomes a promise with no kits behind it.
A button that says "the 2 a.m. file had no quantity for this kit, checked when you pressed submit" can be the right first release, when every listener heard that sentence and nobody heard "your workshop has a date." The harm begins when one sentence is allowed to stand for every hearing. What the button may repeat, across a file, a credit limit, a draft at another branch, and a phone call, is the contract. A requirement that does not name those hearings has the shape of minutes from a meeting that ended early (Data Contracts Matter More Than APIs).
What should you ask before requirements are conversations you end?
Ask these before the sentence is allowed to leave the room. Clear answers mean the speakers have agreed, or each hearing has its own words. Fog means you have minutes. Do not let a test pretend those minutes are a product.
- Who will act on this sentence, and what will they say out loud because it shipped? Write that sentence in their words. "I can promise the workshop a date" is a different product from "the 2 a.m. file had quantity." If you cannot write it, you do not know what you are publishing.
- Who was not in the room, and which hearing would they reject? A missing speaker is a hearing you have chosen not to price. If credit, the other branch, or the person who voids the date is absent, write that absence down as a risk with a name.
- Which words already mean something else in another department? Available, approved, customer, done, paid, stock. A sharper definition chooses one meaning. It does not retire the others, and the people who lost should be able to see the choice.
- At which moment is the sentence true? Page load, submit, warehouse pick, or the moment the dealer says the date. A requirement with no moment is true in the workshop and false on Tuesday. Name the moment on the same line as the rule.
- If two hearings disagree, which one may the system show, and who may override it? A rule with no person beside it will be rewritten by the first angry call. A button with no named override has nominated the loudest ticket as the author.
- What would have to change in the sentence before the person who loses can sign it? If nobody loses, the conversation has not happened. Someone is being saved for production, where the date is already public.
- What will you refuse to build until that sentence exists? Name the cut. "The file's quantity, checked at submit, with no promise of a date" is a requirement a credit lead can argue with. "Order when stock is available" is minutes with a component attached.
When the speaker, the moment, and the hearing have to be invented afterward, the requirement was an invention too. A tidy ticket should not decide what a dealer is allowed to promise.
Implications for how you read a requirement
Read the document as minutes. The useful question is who has not spoken, and which of their words the system will be forced to say anyway. A clear sentence can still be unfinished. Finished is a property of the speaker set.
Split the sentence until each hearing has its own words. A quantity on a nightly file and a date said to a workshop cannot share a button. A message cannot be both a refusal and a Thursday allocation.
Put the person who will be contradicted where the sentence closes. The credit lead who knows which drafts are fiction. The dealer who will say the date. The colleague who calls the workshop back. A review by people who will never unsay the sentence is a review of the invitation list.
Treat a change request that reuses the closed word as a new conversation. A fixed date does not fill an empty speaker set. "Just capture the order" lets a second hearing inherit the first hearing's lack of a loser, including the option to leave it out of this release.
Ship the narrower hearing on purpose. The button that checks the file at submit is allowed to be the whole release. A smaller promise is finished when nobody will own the phone call for the larger one. Calling that cut a later phase keeps the larger promise alive with nobody in the room.
A signature, including one that arrived already signed off, shows that a document ended. It does not show that the speaker set was present. Asking who was absent is part of reading the work.
The fingerprint
A requirement is not the sentence in the document.
It is the conversation that sentence was allowed to end.
If you cannot name who was not in the room, and which of their words the system will refuse to say, the document has already spent the money. The invoice arrives as a workshop that was promised a date, and a warehouse that had one kit.
Related reading
- The Most Expensive Word in Software: Simple
- Every Software Estimate Is a Risk Estimate
- Why We Sometimes Say No to Projects
- Enterprise Software Is Mostly Negotiation
- Data Contracts Matter More Than APIs
- Why Every Workflow Is Really a State Machine
Founder Logs #40 · Part of Binary and Beyond. LinkedIn newsletter edition follows.
